Subhi, A. (2025) “Simulation And Optimization of The Sulaymaniyah Combined Cycle Power Plant 1500 MW in Chamchamal, Kurdistan”, EURASIAN JOURNAL OF SCIENCE AND ENGINEERING, 11(3), pp. 12–24. doi:10.23918/eajse.v11i3p2.