[1]
Subhi, A. et al. 2025. Simulation And Optimization of The Sulaymaniyah Combined Cycle Power Plant 1500 MW in Chamchamal, Kurdistan. EURASIAN JOURNAL OF SCIENCE AND ENGINEERING. 11, 3 (Nov. 2025), 12–24. DOI:https://doi.org/10.23918/eajse.v11i3p2.